Skip to content
WillistonINSULATION

How we work

Quote to finish, in five steps.

This is a real sequence, and the order matters. The walk comes before the quote, and the quote comes before anyone unloads a hose.

  1. 1

    Tell us about the building

    A quote request with the town, the building type, and what's going on is enough to start. Plan sets welcome. We'll ask the questions that change the answer: heated or not, what's in the attic now, where the cold is coming from.

  2. 2

    We look at it

    For anything beyond a straightforward attic top-up, the owner comes out and walks the building. Attic, rim joist, crawl, shop ceiling. We're looking for where the line is broken, not for things to sell.

  3. 3

    You get a quote by assembly

    Rim joist, walls, attic, crawl, each priced on its own with the material we'd use and why. If a cheaper system does the job on one of them, that's what's on the quote.

  4. 4

    We install it

    Masked, sprayed, trimmed, blown, or batted, depending on the assembly. Most houses are one day of foam and one attic trip. Shops are usually one to two days. You'll know before we start.

  5. 5

    We document it

    Thickness and coverage per assembly, photos of the work, and anything the inspector or your builder needs. You get the same record we keep.

Work photos

We're a new company and would rather show you real jobs than stock photos of someone else's. This space fills in as the work gets done. In the meantime, the drawings on this site are how we actually think about a wall.

Start with step one

Send the basics and an owner comes back with a straight answer on what it needs, what it doesn't, and what it costs.

Get a quote